Prove the happy path
- Can describe the whole topology
- Can separate environment configuration
- Can execute smoke tests
- Can explain code vs database rollback constraints
This is the transfer exercise for Phase 34: Production Deployment. The detailed lessons are now closed-book reference material. Your task is to prove that the phase outcome can be reproduced from requirements, repository evidence, and debugging—not by copying a finished implementation.
Target artifact Staging and production deployment runbooks with release identity, environment matrix, smoke tests, and rollback procedure.
Acceptance criteria - Write the behavior and constraints before implementation. - Identify the owning layer and every boundary crossed. - Implement the smallest complete vertical slice. - Verify the happy path from outside the implementation. - Demonstrate at least one expected failure path. - Run the phase-relevant quality checks. - Review the diff for accidental duplication, leaked responsibilities, missing validation/authorization, and hidden environment assumptions.
Evidence packet Save the command/request used, expected result, actual result, one failure reproduction, the fix, and a short explanation of why the final responsibility belongs where it does. This packet is more valuable than a screenshot of a green page because it demonstrates repeatable engineering reasoning.
Stretch Change one requirement after the first implementation. Measure which files must change. If a tiny domain change causes unrelated layers to move, use that evidence to discuss coupling before adding another abstraction.
A guided lesson proves you can follow. A capstone proves you can transfer the model to a requirement with fewer cues.
Create separate staging/production environment matrices before entering any dashboard values.
Deploy Next.js from the intended monorepo root with public/server env vars separated.
Deploy the exact API container artifact and verify bind address, PORT, and readiness endpoint.
Apply database migrations as a controlled release step and document backward-compatibility assumptions.
Configure custom domains/TLS and the exact CORS/redirect origins for production.
Run a smoke-test checklist and practice rollback of code while reasoning about whether the database migration is reversible.
Run the phase mastery checklist without looking at the provided implementation.
Perform a short architecture review and document one trade-off you consciously accepted.
Requirement -> implementation diff -> verification -> controlled failure -> diagnosis -> final proofDo not copy this as a finished answer. Predict what each boundary does, type the smallest useful slice, run it, then compare the result with your prediction.
Return to the mental model and acceptance criteria. Rebuild one smaller slice from first principles before reopening the source.
Choose an external observer: HTTP client, browser, database query, test runner, health endpoint, or deployment log, and capture deterministic evidence.
Extend the phase artifact with one requirement not used in the guided example while preserving the same ownership rules and verification strategy.
Apply database migrations as a controlled release step and document backward-compatibility assumptions.
Use the smallest change that demonstrates this lesson. Stop after it works and capture evidence.Rollback plan assumes schema can always be downgraded
Predict the symptom before causing the failure. Then locate the earliest boundary where reality diverges from expectation.Why does this responsibility live here, what input does it trust, what output proves success, and what would go wrong if another layer owned it?
If your explanation is vague, repeat the boundary trace before moving on.Close the reference. Reproduce the core idea from memory or explain the exact request/data flow aloud. Then check your diff or notes for accidental shortcuts that bypass validation, authorization, error handling, or verification earned in earlier phases.